{"id":612,"date":"2026-11-24T08:31:49","date_gmt":"2026-11-24T06:31:49","guid":{"rendered":"https:\/\/diwepro.com\/en\/?p=612"},"modified":"2026-11-24T09:35:54","modified_gmt":"2026-11-24T07:35:54","slug":"how-to-manage-welding-procedures-digitally","status":"publish","type":"post","link":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/","title":{"rendered":"How to Manage Welding Procedures Digitally?"},"content":{"rendered":"<p>Digital welding procedure management brings welding procedure specifications (WPS), qualification records, revisions, and project documentation into one controlled workflow. The process starts with a preliminary welding procedure specification (pWPS) and continues through qualification, approval, production use, and document management.<\/p>\n<p>For welding coordinators and quality managers, the goal is to ensure that the correct, approved procedure is available for each job and supported by the required qualification records.<\/p>\n<h2>1. Identify the applicable welding requirements<\/h2>\n<p>Before preparing a welding procedure, determine which standards and project requirements apply.<\/p>\n<p>Different standards govern different aspects of welding. For example:<\/p>\n<ul>\n<li><strong>ISO 15607<\/strong> establishes general rules for specifying and qualifying welding procedures.<\/li>\n<li><strong>ISO 15609-1<\/strong> defines WPS content requirements for arc welding of metallic materials.<\/li>\n<li><strong>ISO 15614-1<\/strong> covers welding procedure qualification testing within its scope.<\/li>\n<li><strong>ASME Section IX<\/strong> provides procedure and personnel qualification requirements for applications governed by that code.<\/li>\n<\/ul>\n<p>The applicable standard and project specifications determine the qualification route, required documentation, and approval responsibilities.<\/p>\n<p>These requirements should be identified before creating or approving a WPS.<\/p>\n<h2>2. Prepare the preliminary welding procedure specification (pWPS)<\/h2>\n<p>A pWPS describes the proposed welding procedure before its qualification is completed.<\/p>\n<p>It contains the information needed to perform the intended weld, including relevant process parameters and material requirements.<\/p>\n<p>Typical information includes:<\/p>\n<table>\n<thead>\n<tr>\n<th>Information<\/th>\n<th>Examples<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Welding process<\/td>\n<td>Process designation and welding method<\/td>\n<\/tr>\n<tr>\n<td>Parent materials<\/td>\n<td>Material grades, groups, and applicable dimensions<\/td>\n<\/tr>\n<tr>\n<td>Joint preparation<\/td>\n<td>Joint type, dimensions, and preparation<\/td>\n<\/tr>\n<tr>\n<td>Welding consumables<\/td>\n<td>Filler material and applicable specifications<\/td>\n<\/tr>\n<tr>\n<td>Welding parameters<\/td>\n<td>Current, voltage, polarity, travel speed, or heat input as applicable<\/td>\n<\/tr>\n<tr>\n<td>Welding conditions<\/td>\n<td>Position, preheat, interpass temperature, and any required heat treatment<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The exact information depends on the welding process and applicable standard.<\/p>\n<p><strong>With DIWE PRO, you can create and manage preliminary welding procedures in the same system used for welding quality documentation.<\/strong> This keeps procedure information accessible as the qualification process progresses.<\/p>\n<h2>3. Qualify the welding procedure<\/h2>\n<p>Where qualification by procedure testing is required, the next step is to produce and examine a test weld according to the applicable standard.<\/p>\n<p>The qualification process typically includes preparing the test joint, recording welding parameters, performing the required examinations and tests, and documenting the results.<\/p>\n<p>The welding procedure qualification record (WPQR) documents the qualification evidence and the approved range of qualification.<\/p>\n<p>It is important to distinguish between the documents:<\/p>\n<ul>\n<li><strong>pWPS:<\/strong> The proposed welding procedure.<\/li>\n<li><strong>WPQR:<\/strong> The qualification record supporting the approved procedure.<\/li>\n<li><strong>WPS:<\/strong> The welding instructions used in production.<\/li>\n<\/ul>\n<p>Not every qualification route requires a new procedure test. The applicable requirements determine which method can be used.<\/p>\n<h2>4. Approve and release the production WPS<\/h2>\n<p>Once the required qualification has been completed and approved, the production WPS can be finalized.<\/p>\n<p>The released WPS should identify its applicable qualification record, authorized welding parameters, and current revision.<\/p>\n<p>In DIWE PRO, you can convert a pWPS into a WPS after the welding procedure qualification test has been approved and the associated WPQR linked.<\/p>\n<p>This allows us to keep preliminary procedures, qualification evidence, and production instructions connected within one system.<\/p>\n<p>The software supports document management; the technical approval must still follow the applicable qualification requirements.<\/p>\n<h2>5. Control WPS revisions and changes<\/h2>\n<p>Welding procedures may need updating when materials, welding parameters, or production requirements change.<\/p>\n<p>Before releasing a revised WPS, check whether the proposed changes remain within the existing qualification range.<\/p>\n<p>Changes outside that range may require additional qualification, depending on the applicable standard.<\/p>\n<p>Effective revision control should make it clear:<\/p>\n<ul>\n<li>Which WPS revision is currently approved for production.<\/li>\n<li>Which qualification record supports the procedure.<\/li>\n<li>What has changed between revisions.<\/li>\n<li>Which revision applies to a particular project.<\/li>\n<\/ul>\n<p>Our welding management software supports document version control and project-specific retrieval, helping teams find the correct procedure without searching through separate files.<\/p>\n<h2>6. Verify welder qualifications before production<\/h2>\n<p>An approved welding procedure does not automatically mean every welder is qualified to use it.<\/p>\n<p>Before assigning work, the welding coordinator must verify that the welder&#8217;s qualifications cover the intended welding process, materials, position, and other applicable variables.<\/p>\n<p>In DIWE PRO, we connect welder qualifications with welding procedures, methods, and filler materials. Welders can see which procedures and materials they are authorized to use.<\/p>\n<p>We also provide notifications when welder qualifications are approaching expiry.<\/p>\n<p>This helps welding coordinators identify qualification issues before assigning work, while the underlying records remain the basis for determining eligibility.<\/p>\n<h2>7. Keep welding documentation connected to each project<\/h2>\n<p>WPS management continues throughout production and documentation.<\/p>\n<p>A welding project may require several types of records, including:<\/p>\n<ul>\n<li>Approved WPS and supporting WPQR documents<\/li>\n<li>Welder qualification records<\/li>\n<li>Material and filler material certificates<\/li>\n<li>Welding inspection checklists<\/li>\n<li>NDT reports<\/li>\n<li>Drawings and other project documentation<\/li>\n<\/ul>\n<p>Keeping these records together makes it easier to find the information needed for quality control, inspections, and audits.<\/p>\n<p>With DIWE PRO, we organize welding documentation by project or job number. Documents can be retrieved by project, customer, or date, and the system supports version control and electronic signatures.<\/p>\n<p>We also support automatic recognition and interpretation of PDF and scanned documents, reducing the need for manual data entry.<\/p>\n<h2>8. Verify the documentation before inspection or audit<\/h2>\n<p>Before an inspection or audit, check that the records reflect the welding work performed.<\/p>\n<p>The key questions are:<\/p>\n<ol>\n<li>Is the correct WPS revision available for the project?<\/li>\n<li>Is the procedure supported by the required qualification documentation?<\/li>\n<li>Are the assigned welders appropriately qualified?<\/li>\n<li>Are the required inspection and project records available?<\/li>\n<\/ol>\n<p>Digital documentation makes these checks easier to organize, but it does not replace the technical verification of welding procedures or personnel qualifications.<\/p>\n<h2>Manage welding procedures with DIWE PRO<\/h2>\n<p>Managing welding procedures becomes more complex when WPS documents, qualification records, and project files are stored separately.<\/p>\n<p>With DIWE PRO, we bring welding procedures, welder qualifications, welding test records, and project documentation into one system.<\/p>\n<p>Our goal is to make welding information easier to manage, retrieve, and maintain throughout production.<\/p>\n<p><strong>Want to simplify welding procedure management?<\/strong> <a href=\"https:\/\/diwepro.com\/en\/welding-management-software\/\">Explore our welding management software<\/a> and see how DIWE PRO can support your workflow.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Digital welding procedure management brings welding procedure specifications (WPS), qualification records, revisions, and project documentation into one controlled workflow. The process starts with a preliminary welding procedure specification (pWPS) and continues through qualification, approval, production use, and document management. For welding coordinators and quality managers, the goal is to ensure that the correct, approved procedure&#8230;<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-612","post","type-post","status-publish","format-standard","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Manage Welding Procedures Digitally? - Diwe Pro<\/title>\n<meta name=\"description\" content=\"Build a digital WPS workflow from pWPS and qualification test to production release, welder authorization, revision control, and audit checks.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Manage Welding Procedures Digitally? - Diwe Pro\" \/>\n<meta property=\"og:description\" content=\"Build a digital WPS workflow from pWPS and qualification test to production release, welder authorization, revision control, and audit checks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/\" \/>\n<meta property=\"og:site_name\" content=\"Diwe Pro\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-24T06:31:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-24T07:35:54+00:00\" \/>\n<meta name=\"author\" content=\"Pasi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Pasi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/how-to-manage-welding-procedures-digitally\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/how-to-manage-welding-procedures-digitally\\\/\"},\"author\":{\"name\":\"Pasi\",\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/#\\\/schema\\\/person\\\/238075f8c6fff8557739fff3e6fa4d54\"},\"headline\":\"How to Manage Welding Procedures Digitally?\",\"datePublished\":\"2026-11-24T06:31:49+00:00\",\"dateModified\":\"2026-11-24T07:35:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/how-to-manage-welding-procedures-digitally\\\/\"},\"wordCount\":981,\"publisher\":{\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/how-to-manage-welding-procedures-digitally\\\/\",\"url\":\"https:\\\/\\\/diwepro.com\\\/en\\\/how-to-manage-welding-procedures-digitally\\\/\",\"name\":\"How to Manage Welding Procedures Digitally? - Diwe Pro\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/#website\"},\"datePublished\":\"2026-11-24T06:31:49+00:00\",\"dateModified\":\"2026-11-24T07:35:54+00:00\",\"description\":\"Build a digital WPS workflow from pWPS and qualification test to production release, welder authorization, revision control, and audit checks.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/how-to-manage-welding-procedures-digitally\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/diwepro.com\\\/en\\\/how-to-manage-welding-procedures-digitally\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/how-to-manage-welding-procedures-digitally\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Etusivu\",\"item\":\"https:\\\/\\\/diwepro.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Manage Welding Procedures Digitally?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/diwepro.com\\\/en\\\/\",\"name\":\"Diwe Pro\",\"description\":\"Directory of welding procedures\",\"publisher\":{\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/diwepro.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/#organization\",\"name\":\"Diwe Pro\",\"url\":\"https:\\\/\\\/diwepro.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/diwepro.com\\\/wp-content\\\/uploads\\\/fav-diwePro.png\",\"contentUrl\":\"https:\\\/\\\/diwepro.com\\\/wp-content\\\/uploads\\\/fav-diwePro.png\",\"width\":512,\"height\":512,\"caption\":\"Diwe Pro\"},\"image\":{\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/diwepro.com\\\/en\\\/#\\\/schema\\\/person\\\/238075f8c6fff8557739fff3e6fa4d54\",\"name\":\"Pasi\",\"url\":\"https:\\\/\\\/diwepro.com\\\/en\\\/author\\\/pasi\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Manage Welding Procedures Digitally? - Diwe Pro","description":"Build a digital WPS workflow from pWPS and qualification test to production release, welder authorization, revision control, and audit checks.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/","og_locale":"en_US","og_type":"article","og_title":"How to Manage Welding Procedures Digitally? - Diwe Pro","og_description":"Build a digital WPS workflow from pWPS and qualification test to production release, welder authorization, revision control, and audit checks.","og_url":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/","og_site_name":"Diwe Pro","article_published_time":"2026-11-24T06:31:49+00:00","article_modified_time":"2026-11-24T07:35:54+00:00","author":"Pasi","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Pasi","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/#article","isPartOf":{"@id":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/"},"author":{"name":"Pasi","@id":"https:\/\/diwepro.com\/en\/#\/schema\/person\/238075f8c6fff8557739fff3e6fa4d54"},"headline":"How to Manage Welding Procedures Digitally?","datePublished":"2026-11-24T06:31:49+00:00","dateModified":"2026-11-24T07:35:54+00:00","mainEntityOfPage":{"@id":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/"},"wordCount":981,"publisher":{"@id":"https:\/\/diwepro.com\/en\/#organization"},"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/","url":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/","name":"How to Manage Welding Procedures Digitally? - Diwe Pro","isPartOf":{"@id":"https:\/\/diwepro.com\/en\/#website"},"datePublished":"2026-11-24T06:31:49+00:00","dateModified":"2026-11-24T07:35:54+00:00","description":"Build a digital WPS workflow from pWPS and qualification test to production release, welder authorization, revision control, and audit checks.","breadcrumb":{"@id":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/diwepro.com\/en\/how-to-manage-welding-procedures-digitally\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Etusivu","item":"https:\/\/diwepro.com\/en\/"},{"@type":"ListItem","position":2,"name":"How to Manage Welding Procedures Digitally?"}]},{"@type":"WebSite","@id":"https:\/\/diwepro.com\/en\/#website","url":"https:\/\/diwepro.com\/en\/","name":"Diwe Pro","description":"Directory of welding procedures","publisher":{"@id":"https:\/\/diwepro.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/diwepro.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/diwepro.com\/en\/#organization","name":"Diwe Pro","url":"https:\/\/diwepro.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/diwepro.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/diwepro.com\/wp-content\/uploads\/fav-diwePro.png","contentUrl":"https:\/\/diwepro.com\/wp-content\/uploads\/fav-diwePro.png","width":512,"height":512,"caption":"Diwe Pro"},"image":{"@id":"https:\/\/diwepro.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/diwepro.com\/en\/#\/schema\/person\/238075f8c6fff8557739fff3e6fa4d54","name":"Pasi","url":"https:\/\/diwepro.com\/en\/author\/pasi\/"}]}},"_links":{"self":[{"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/posts\/612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/comments?post=612"}],"version-history":[{"count":6,"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/posts\/612\/revisions"}],"predecessor-version":[{"id":633,"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/posts\/612\/revisions\/633"}],"wp:attachment":[{"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/media?parent=612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/categories?post=612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/diwepro.com\/en\/wp-json\/wp\/v2\/tags?post=612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}